Siloed or fragmented data
Reliable, up-to-date data is vital to decision-making, so it’s important for companies to ensure that important information resources are not overlooked. Organizations that lack standardized data gathering, storage, and data governance are at risk of experiencing data management and quality issues. A study on data governance asserted that business units that use separate data management systems trap critical information in silos, which causes data fragmentation, obstructs the flow of data, impacts the efficiency of strategic planning, and prevents companies from having a single, unified source of truth. Overall, fragmented data leads to miscommunication and unsubstantiated decisions.
Incorrect or unusable data
In general, incorrect and unusable data is incomplete, inaccurate, or inaccessible information. It is often the result of manual data entry processes where data is outdated, omitted, or locked in spreadsheet or paper documents that are stored in an unknown location.
Another scenario that renders data unusable is when organizations fail to establish standardized data governance protocols. Stakeholders might use different terminology, units of measurement, or data formats that pose the risk of data bias, inconsistency, misinterpretation, and costly errors.
Document version control
Given the dynamic nature of construction projects, there are frequent changes and variations throughout a project’s lifecycle that make it difficult to continually synchronize updates with all relevant stakeholders. Unfortunately, decisions may be made based on incorrect or incomplete information. Modifications in construction projects that impact documentation are often the result of several factors:
Unexpected problems with the project or building site.
Changes or insufficient details in design documents.
Project scope changes.
Documentation mistakes.
Ineffective site and project management.
Poor communication and coordination between project stakeholders, which can lead to document changes without the proper change order.
Accurate documentation is necessary to ensure that project teams understand the design intent, project requirements, and technical specifications to complete the project. However, when different or outdated versions of documents are in circulation, it leads to inconsistencies and misunderstanding aspects of the project, such as the order of tasks, project phases, and completion schedules. Byproducts of this scenario are stakeholder confusion, conflict, errors, rework, and inspection and compliance violations.
Despite the drive toward modernization, technology alignment is frequently spotlighted as a contributor to the challenges companies face with document management. For instance, many companies are employing eclectic methods of data collection and storage. Survey data on documentation storage from a small study on information management revealed:
42% store necessary documentation on a network drive or company server.
25% use local hard drives or optical media and USB sticks.
3% leave documents stored in emails.
24% use cloud storage services.
6% store documentation in the form of a Common Data Environment (CDE) platform.
Project teams operate under resource and time constraints. Inefficient information management, failure to implement standardized processes and applications, as well as the lack of centralized document storage engenders mistrust and collaboration breakdowns across teams.
Security
The amount of sensitive content construction companies collect and store continually increases, which means over the course of a project, more people require access to proprietary information. There has been an influx of technology usage in many industries, and the construction industry is no exception. Proprietary information, such as banking information, bid information, blueprints, project designs, and employee information makes employing security measures a critical endeavor to ensure the protection of confidential information.
The supply chains for construction projects are expansive and function on many levels, which further complicates the task of maintaining sufficient control over proprietary information. The onus is on companies to safeguard information resources. Attacks and data breaches can have a lasting impact on the company in terms of potential fines, delayed projects, and reputation damage. According to the 2026 IBM Cost of a Data Breach report, the average cost of a data breach across industries is a record high $4.99 million.
Because construction projects are usually short-term with a pre-defined lifecycle, the company’s cybersecurity protocols need to align with a project’s temporary paradigm. A study titled “An Analysis of Cybersecurity Issues in Construction Industry in Digital Transformation” includes some recommended information protection strategies:
Educate employees on cybersecurity awareness. Train personnel on processes such as what to watch for in emails and verifying a site’s legitimacy before clicking links.
Vet subcontractors and suppliers. Conduct frequent reviews to ensure third-party entities adhere to the same cybersecurity protocols enforced by the company.
Apply threat intelligence measures. Gather and analyze data across the entire IT infrastructure (software, hardware, network, endpoints) to identify risks and vulnerabilities.